St. John of Damascus Church
Completed 2024. Two phase restoration of multiple icons along the Nave and Sanctuary walls. Restortoration included cleaning the surfaces with the appropriate solutions and repainting
Completed 2024. Two phase restoration of multiple icons along the Nave and Sanctuary walls. Restortoration included cleaning the surfaces with the appropriate solutions and repainting
Completed 2024. Comprehensive stabilization of the back left wall of the Main Sanctuary via an exclusive plaster consolidation technique used to treat existing deteriorating plaster
Completed in 2010 Comments: Refurbishment of 12 lighting fixtures with new white acrylic side panels for increased light transmission. Learn more About: Interior Design, Lighting
Completed 2002. Supplied metal chairs with straight interlocking device & glides, card pockets, and underseat book racks with front/rear access. Finish color, Silver Vein and