GoldenSword International Fellowship
Completed 2022. Interior plaster repairs and painting throughout the church. Remolded existing stage to accommodate a new area for the lectern and stage access. Learn
Completed 2022. Interior plaster repairs and painting throughout the church. Remolded existing stage to accommodate a new area for the lectern and stage access. Learn
Completed 2023. Interior painting with added wooden trim. Stone applied to back sanctuary wall and side shrines. Extending of altar platform and fabrication of new
Completed 2023. Interior painting with gold trim detail. New pews and chairs by New Holland. Custom printed blue and gold carpet. New A/V booth and
Completed 2023. Interior painting with marbleization of columns and decorative stencil in sanctuary. Refinishing of church pews and hardwood floors. Installation of LVT in marble
Completed early 2019 Full interior renovation including renderings and design consultation, pew refinishing, new altar flooring and design, mural restoration, interior painting, restoration & retrofit
Completed in 2015. New Tile and Granite Floor per design. Wood design on front wall. Learn more About: Church Carpet, Church Pew Cushions, Design Concept, Flooring,
Completed in 2011. Interior design concept presentation. Learn more About Design Concept
Completed 2014- 2016 Design and planning of interior remodel – flooring, Altar reconfiguration and new baptismal font. New pews crafted and installed by New Holland