St. Pius X Roman Catholic Church
Completed 2014- 2016 Design and planning of interior remodel – flooring, Altar reconfiguration and new baptismal font. New pews crafted and installed by New Holland
Completed 2014- 2016 Design and planning of interior remodel – flooring, Altar reconfiguration and new baptismal font. New pews crafted and installed by New Holland
Completed 2024. Custom Tabernacle Stand crafted and installed by New Holland Church Furniture. Completed 2008. Interior renovations to the Sanctuary include: 44 Wood Pews, Chancel Furniture
Completed in 2014 Comments: Painting of the Church side doors Learn more About: Exterior Church Painting, Painting
Completed in 2011 Comments: Installed video equipment, projector and screen Learn more About: Sound System/ AV Systems
Completed in 2012 [gss ids=”2387,2386,2385″ name=”st-pauls-cogic-church” options=”timeout=4000″ style=”width:300px;float:right;”] Learn more About: Church Carpet, Church Pew Cushions, Church Pew Upholstery, Flooring
Completed in 2005 Comments: Removed old carpet, installed new Learn more About: Church Carpet, Flooring
Completed in 2004 Comments: Installed New Pulpit Furniture (Stool, Credence Table, and Custom Flower Stands) Learn more About: Miscellaneous
Completed in 2004 Comments: Complete strip & refinish of all pews, bookracks and kneelers Learn more About: Church Pew Refinishing
Completed in 2009 Comments: Provided 48 reversible, loose boxed and tufted with self-welt, contoured style cushions for existing pews with 2” thick, in dark red
Completed 2004. Interior renovation: Installation of new pews and new kneelers. Refinished and reupholstered existing pews to match the new ones. Learn more about Pew