SS Brendan & Jude Parish
Completed in 2018. Installed 6 Brand New Chandeliers (6 arms with white acrylic bowl, cylinders with mica design) Learn more about: Church Lighting
Completed in 2018. Installed 6 Brand New Chandeliers (6 arms with white acrylic bowl, cylinders with mica design) Learn more about: Church Lighting
Completed in 2018. Performed Interior Church Painting (Sanctuary , Nave, Foyer, Hallway, Bathroom & Choir Loft) Learn more about: Interior
Completed in 2017. Repaired & Painted Entire Chapel Area Replicated & Installed New Stencils to Ceiling Learn more about: Interior Painting After
Completed in 2016. Installed 118 New Contoured Base Pew Cushions (Shire Red Rose) Installed 118 New Kneeler Pads (Shire Red Rose) Installed 298 New Solid
Completed in 2018. Installed 32 Standard Reversible Loose Pew Cushions (Shire Red Rose Fabric) Learn more about: Pew Cushions & Upholstery
Completed 2019. Window Maintenance: repaired 2 stained glass panels, clean, repair and caulk 6 existing windows, and replace six (6) pieces of protective glass. Learn
Completed in 2019. Installed 83 New Metal-Frame Kneelers to Existing Pews (Sherpa Mocha Fabric) Learn more about: Kneelers
Completed 2022. Solid wood chairs with kneelers (52) crafted and installed by New Holland Church Furniture. Completed 2019. Supplied and installed new metal-framed kneelers to
Completed in 2019. Installed All New Kneelers For Existing Pews (Shire Red Rose) Upholstered All Existing Pews (Shire Red Rose) Learn more about: Pew Cushions
Completed 2019, 2023. Interior painting in the Nave, Sacristy, Chapel area and Foyer. Interior renovations and Altar & Lectern modifications. Learn more about: Interior Painting,